Owner: Noble Energy

Location: Mustang West

Project Scope:

The Noble Mustang Distribution line was built to provide primary power to several Noble Energy wells in Weld County.
The project was successfully completed by the deadline in 4,000 manhours with zero lost hours due to accidents. Our crews successfully installed:
  • 144 poles
  • 122 anchors and down guys
  • 150,000 feet of 795 ACSR
  • 30,000 feet of 4/0 ACSR
  • (2) 12,000amp recloser take off poles
The crews biggest challenge was installing the two “T” structures and getting the spacing right and the circuits going in three different directions off of each pole.