Expedition Water – EWS #6

Owner: Expedition Water Service – EWS #6 Location: Firestone, CO Completion Date: July 2019 Project Scope: This is the largest water injection facility Expedition has built to date and the fifth facility we’ve built for them. This new disposal plant gives them the ability to take 10,000 barrels a day. Our crews installed the electrical system for…

Holly Frontier – API Separator

Engineer: Holly Frontier Engineers Budget: $333,000 Completion Date: December 2016 Project Scope: N Line Electric was contracted to install new service to an API Separator in refinery. This required us to run cable tray approximately 25’ above ground and install tray cable. This was a very busy work site that required weekend work to finish and…

AIMS Community College 15KV Electrical Distribution System Loop

Engineer: N Line Electric/Spectrum Engineering Location: Greeley, CO Budget: $492,446 Completion Date: June 2017 Project Scope: N Line Electric’s crews installed a complete loop of 15KV Electrical Distribution System at the Greeley Campus. This included adding nearly ½ mile of primary underground ductbank, ¼ mile of bores and over five miles of 15KV underground cables. Along…

  • Motor Control Center

  • Motor Control Center at Anadarko Site

Anadarko Petroleum – Milton Pump Station

Engineer: Tyler Ambrosino Location: Weld County Budget: $175,000 Completion Date: May 2017 Project Scope: This facility is used to pump water from a reservoir for fracking. N Line Electric installed the motor control center, instrumentation, and wire in all valves and devices. We also installed the lightning protection.