Engineer: N Line Electric/Spectrum Engineering
Location: Greeley, CO
Budget: $492,446
Completion Date: June 2017
Project Scope: N Line Electric’s crews installed a complete loop of 15KV Electrical Distribution System at the Greeley Campus. This included adding nearly ½ mile of primary underground ductbank, ¼ mile of bores and over five miles of 15KV underground cables. Along with the 15KV switch gear and sectionalizing cabinets to complete a back feed loop to all campus buildings.